ACE SCAFFOLD
Home/Products/Temporary Roofing System

Temporary Roofing System

Engineered to international standards for safety, speed and durability on every job site.

ACE SCAFFOLD manufactures the Temporary Roofing System — also called a temporary roof or Diamond Beam roof — an all-aluminum modular structure that sheets over and protects the area below from rain, wind, dust and containment during construction, renovation, restoration and events. Built from diamond beams, K-frames, horizontal and roller braces covered with keder or shrinkwrap sheeting, it spans any length and can be erected by hand-built, roll-out or crane-assisted methods. As a temporary roofing manufacturer we provide engineer-backed design support, OEM/ODM and FOB Shanghai delivery.

Temporary Roofing System - All-Aluminum Modular Temporary Roof (Diamond Beam)

Key Features

  • All-aluminum modular Diamond Beam truss
  • Spans large openings with minimal internal support
  • Three erection methods: hand-built, roll-out, crane-assisted
  • Covered with keder or shrinkwrap sheeting
  • Spigot connections with 6 × Ø12 mm safety locking pins
  • Engineer-designed support & OEM/ODM available

A temporary roofing system is a sheeted structure designed to protect the area inside from the effects of weather, dust and containment. The ACE SCAFFOLD Temporary Roofing System is an all-aluminum modular temporary roof: the roofing assembly is composed of diamond beams, K-frames, horizontal braces and roller braces covered by either shrinkwrap or keder sheets. The diamond beam design gives a light, strong, rapidly assembled truss that spans large openings with minimal internal support.

Temporary Roof Assembly

The roofing assembly is composed of diamond beams, K-frames, horizontal braces and roller braces, covered by either shrinkwrap or keder sheets. Beams join together using spigot connections for fast, tool-light assembly. The roof can be supported by the existing building, scaffolding or any suitable structure — but the supporting structure must always be checked and designed by a competent engineer to ensure it withstands the generated loads.

Diamond Beam Truss

The diamond beam is the primary truss member. Ridge beams and eave beams (both supplied with integral track) connect to the diamond beams using steel spigots with 6 × Ø12 mm locking pins to complete each roof truss. K-frames fix at the eaves and repeat upslope to the ridge at 2 m intervals, while horizontal braces between the K-frames create 1 m lateral bracing for the compression chord and roller braces sit in the pockets at the ridge and eaves.

Three Erection Methods

The roof can be installed by the method best suited to site conditions: - Hand-built installation — trusses assembled bay by bay on a temporary scaffold tower at midspan. - Roll-out installation — a rolling roof assembly built on a runway beam and rolled into position. - Crane-assisted installation — fully braced bays assembled at ground level and lifted into place by crane.

Sheet Covering

Once the structure is complete, the keder sheet is pulled over the track and secured to the scaffold. Sheeting can be installed sequentially as each bay is finished, or all together once the full roof is assembled.

Bracing & Safety

Braced bays, brace spacing and infill limits follow the engineer design. Typical configurations: 1 braced bay in 3 (manual, zigzag) or 1 in 2 (crane, K-frame), with diagonal braces at 1 m zigzag spacing and horizontal braces at 1 m (top chord) / 2 m (bottom chord).

Temporary Roofing System Specifications

MaterialAluminum Alloy
Surface TreatmentMill Finish
Compliance StandardEN 12810 / BS 1139 / AS-NZS 1576
CertificateISO 9001, CE
OEM / ODMAvailable
PackagingBundle / Steel Pallet
Lead Time30 days (production, excl. sea freight)
MOQ1 × 20ft Container

Temporary Roofing System Components

Temporary Roofing System 18 degree ridge beam
18 degree ridge beam
Temporary Roofing System 18 degree top plate
18 degree top plate
Temporary Roofing System 27 degree ridge beam
27 degree ridge beam
Temporary Roofing System 36 degree ridge beam
36 degree ridge beam
Temporary Roofing System 36 degree top plate
36 degree top plate
Temporary Roofing System K frame
K frame
Temporary Roofing System beam spigot
beam spigot
Temporary Roofing System caster assembly
caster assembly
Temporary Roofing System diagonal brace
diagonal brace
Temporary Roofing System diamond beam
diamond beam
Temporary Roofing System end stopper
end stopper
Temporary Roofing System gravlock
gravlock
Temporary Roofing System hex nuts
hex nuts
Temporary Roofing System horizontal brace
horizontal brace
Temporary Roofing System keder sheet
keder sheet
Temporary Roofing System keder track
keder track
Temporary Roofing System locking pin
locking pin
Temporary Roofing System r clip
r clip
Temporary Roofing System ridge track
ridge track
Temporary Roofing System roller brace
roller brace
Temporary Roofing System roof connector
roof connector
Temporary Roofing System roof eave track
roof eave track
Temporary Roofing System roof eave
roof eave
Temporary Roofing System runway beam
runway beam
Temporary Roofing System safety pin
safety pin
Temporary Roofing System splice plate
splice plate
Temporary Roofing System tension bar assembly
tension bar assembly
Temporary Roofing System tension bar
tension bar
DescriptionModelSpecification
Diamond BeamDBAluminum 6082-T6, various lengths
K FrameKFAluminum, 2 m vertical spacing
Ridge Beam (with track)RBAluminum, 18°/27°/36°
Eave Beam (with track)EBAluminum
Horizontal BraceHBAluminum, 1 m / 2 m
Roller BraceRLBAluminum, ridge & eave pockets
Steel SpigotSP6 × Ø12 × 70 mm locking pins
Keder SheetKSPVC / keder bead, any length
Keder TrackKTAluminum, integrated
Caster AssemblyCAM12 × 40 to 18° top plate
Roof ConnectorRCØ30 × 90 mm locking pin
Runway BeamRWBBeam clamp @ 1.2 m

Temporary Roofing System Picture

Temporary Roofing System 1
Temporary Roofing System 2
Temporary Roofing System 3
ACE SCAFFOLD

Your reliable scaffolding & ICF bracing supplier

HomeAbout UsProductsFAQNewsContact

Contact

0086-139-6251-1900info@acescaffold.comSuzhou, Jiangsu, China
© 2026 ACE SCAFFOLD CO.,LTD. All rights reserved.Privacy Policy | Terms